Telluride ski resort in Colorado has airlifted a new bridge and staircase to Gold Hill on left shoulder of Palmyra Peak.
Canadian helicopter company Heliqwest airlifted two steel staircases and a bridge over the ski resort to its final resting place, the span between Gold Hill Chutes 8 and 9. The new stairway is already open for skiers.
The two sets of stairs measure 48 and 54 feet, and weigh 3304 and 3324 pounds, respectively. The bridge measures 24 feet in length and weighs 2750 pounds. All three components measure 30 inches wide, feature hand railings on both sides and serrated grated steel walking surface. Together, the stairway and bridge combine make up 126 linear feet ascending Gold Hill.
The stairs and bridge were designed and fabricated by 12 year veteran and Lift Master Mechanic, Mark Bosse. With the company since 1997, Bosse custom created, constructed and brought the project to fruition over several months.
“This addition is a continuation of our efforts to provide ski experience which is ‘Unmatched in North America,’” said Dave Riley, CEO of the resort. “This project was extremely technical, and our in house staff has done a phenomenal job in both planning and execution. The Telluride Ski Resort is thrilled to once again expand easy access into epic inbounds terrain.”
Print This Post

Posts feed

Recent Comments